Mogami-class Frigate

From Canadian Power Wiki
Jump to: navigation, search
The frigates JS Mogami (FFM-01) and JS Kumano (FFM-02) docked at Yokosuka Naval Base on May 19th, 2022.

The Mogami-class frigate is a class of twelve frigates developed by Mitsubishi Heavy Industries intended to replace the aging Asagiri-class destroyers and Abukuma-class destroyer escorts currently in service in the Japan Maritime Self-Defense Force. Twelve ships will be built by Mitsubishi Heavy Industries and the Mitsui Engineering & Shipbuilding.

A further 11 will be built for the Royal Australian Navy.

Specifications[edit | edit source]

  • Type: Frigate
  • Service Period: 2022-
  • Characteristics:
    • Length: 436 feet 4 inches (133 meters)
    • Beam: 53 feet 6 inches (16.31 meters)
    • Draft: 29 feet 7 inches (9.02 meters)
    • Displacement: 3,900 tons (Standard); 5,500 tons (Full Load)
  • Crew: 90
  • Propulsion: CODAG
    • 1 x Rolls-Royce MT30 gas turbine
    • 2 x MAN 12V28/33D STC diesel engines
    • 2 x shafts or 2 x waterjets
  • Range:
  • Speed: 30 knots (55.56 km/h)
  • Sensor Suite:
    • OPY-2 Multifunction Radar
    • OAX-3 Electro-Optical/Infrared Targeting System
    • OQQ-25 Sonar System
    • OQQ-11 Anti-Mine Sonar System
    • OYQ-1 Combat Management System
  • Countermeasures:
    • NOLQ-3E Electronic Warfare Suite
  • Armament:
    • 1 x 5"/62-caliber Mk.45 Mod 4 naval gun
    • 1 x 16-cell Mk.41 VLS (fires Type 03 Chuu-SAM and Type 07 VL-ASROC)
    • 2 x 4-cannister AShM Launchers (fires Type 17 AShMs)
    • 2 x OTO Melara Marlin autocannons
    • 2 x 12.75" HOS-303 triple torpedo tubes
    • 1 x SeaRAM Launcher
    • 2 x Remote Weapons System
  • Aircraft Carried: 1 x Mitsubishi SH-60L Seahawk maritime helicopter
  • Boats Carried: 2 x RHIBs, USVs, UUVs

Unit Run[edit | edit source]

Japan[edit | edit source]

  • JS Mogami (FFM-01)
  • JS Kumano (FFM-02)
  • JS Noshiro (FFM-03)
  • JS Mikuma (FFM-04)
  • JS Yahagi (FFM-05)
  • JS Agano (FFM-06)
  • JS Niyodo (FFM-07) - fitting out
  • JS Yubetsu (FFM-08) - fitting out
  • JS Natori (FFM-09) - fitting out
  • JS Unnamed (FFM-10) - under construction
  • JS Unnamed (FFM-11) - planned for construction
  • JS Unnamed (FFM-12) - planned for construction

Australia[edit | edit source]

  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction
  • HMAS Unnamed - planned for construction

Indonesia[edit | edit source]

  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction
  • KRI Unnamed - planned for construction